image missing
Date: 2024-09-27 Page is: DBtxt003.php txt00014474

Transport / Rail Technology
Track Maintenance

VIDEO: How a Railroad Replaces Ties: Every Machine Shown

Burgess COMMENTARY

Peter Burgess

How a Railroad Replaces Ties: Every Machine Shown 87,409 views https://youtu.be/Dz8-RxwvCmo 392 48 SHARE Ferroequinology Published on Nov 13, 2016 SUBSCRIBE 1.9K SUBSCRIBE SUBSCRIBED UNSUBSCRIBE The Complete Union Pacific Tie Change. Hi-tech machines work in sequence to replace old and rotten railroad ties. This is a huge improvement over the old practice of doing it all by hand. A correction: After thinking about it for a while, the small bars at 23:00 were probably to keep the rail from sliding, not the ties. Think about a long, heavy freight train even slightly using the brakes to slow down. The momentum of all those freight cars with brakes on makes entire rail want to slide forward. Those tiny bars probably keep the rail from sliding along the ties, which are firmly embedded in the ballast. _____________________________________________________ Here are 3 more little-known steps that occurred about a month apart: Part 2: https://www.youtube.com/watch?v=iW5j9... Track Evaluation Car/Geometry Train Part 3: https://www.youtube.com/watch?v=FvmBU... Loram Rail Grinder Part 4: https://www.youtube.com/watch?v=s0BvQ... Hi-Rail inspection van Category Autos & Vehicles License Standard YouTube License SHOW LESS 81 Commen

SITE COUNT Amazing and shiny stats
Copyright © 2005-2021 Peter Burgess. All rights reserved. This material may only be used for limited low profit purposes: e.g. socio-enviro-economic performance analysis, education and training.